Go Back Up
C3 Yard - Yard Management

Yard Management System

Optimize Every Move In your Yard

Designed to optimize asset utilization, our powerfull YMS not only increases throughput and boosts productivity but also enhances visibility on every trailer and shipment.
c3solutions_02
  • white-capterra-yard-rating
  • white-g2-yard-rating
  • white-getapp-yard-rating
dock-scheduling

Dock Scheduling Software

Solve the Dock Puzzles That Hold You Back

Designed to simplify your processes, our Best-of-Breed Dock Scheduling System significantly reduces wait times and boosts efficiency, enabling you to achieve peak performance with ease.
  • capterra-dock
  • software-advice-dock
  • g2-dock

Your Challenges

Are These Struggles Familiar to You?

If any of these warning signs describe your operation you may want to start looking for an automated solution:
truck-location

There is often a challenge in tracking the exact location and status of trailers in your yard

labor-planning

You have an ongoing issue with efficiently allocating resources, such as staff and equipment

truck-bottleneck

A frequent congestion and delays at the gates, resulting in prolonged truck waiting times

Book a Demo

MAIN BENEFITS

AI Precision, Smarter Decision

Gain Real-time Visibility

C3 Yard will oversee your gates, offer insight into trailers and shipments, and substantially boost the productivity of your yard drivers and dock workers.
yard-management-view
inventory-control

Enhance Inventory Control

Gain insight into what inventory is stored on-site and its specific location. C3 Yard Offers detailed visibility at the SKU level.

Cut All Detention Fees

By monitoring the duration trailers remain stationary and automatically informing carriers when trailers are available.
yard-management-duration

Our Main Features

360° Visibility Platform

Automated Shunter Assignment

Leveraging AI-Enabled business rules and priority levels, C3 Yard continuously analyzes the pool of tasks to assign drivers the most efficient tasks.

Gate Management

Substitute traditional spreadsheets, manual logs, and phone calls with a simplified, streamlined process that includes visibility before arrival.

Real-time Visibility on Yard Assets

Understand the locations of parked trailers and tractors, and track the availability or shortage of empty trailers for shipping.

Seal Management

Every user action is documented to generate detailed reports, enabling effective follow-up on any discrepancies in seals.

Inbound Planning Tools

Access comprehensive information necessary to effectively plan daily activities and evenly distribute the workload between dock and yard drivers.

Business Rule Engine

Allow C3 Yard to streamline your operations by adapting your unique processes into business rules that automate repetitive tasks.

Enterprise Integration

C3 Yard can be seamlessly connected with WMS, TMS, and ERP systems to facilitate communication across other supply chain platforms. 

Operational Reports

Create customized analytical reports tailored to your needs, including metrics like driver productivity, gate activity, trailer status, time spent in the yard, dock door utilization, and more.

Exception Alerts

You can set up email alerts to flag urgent events that need your attention, such as idle yard truck drivers, late arrivals, or delayed departures.

Precision Tools for All Supply Chain Roles

supply-chain-strategist

Senior Level Decision Maker

YOUR CHALLENGE
Balance efficiency and cost-effectiveness with your supply chain expertise by streamlining labor, equipment, and inventory. Ensure timely, error-free delivery to meet customer expectations and maintain high standards to avoid fines and reputational damage.

OUR SOLUTION
We will help you reduce costs through streamlined processes, deliver flawless operations, and easily manage regulatory requirements.

logistics-manager

DC/Operations Manager

YOUR CHALLENGE
As a DC/Operations manager focused on operational excellence, you aim to enhance efficiency and eliminate bottlenecks. Challenges include inefficiencies in dock operations due to manual processes, maintaining shipment visibility, and integrating dock management software with other systems.

OUR SOLUTION
Our solutions help by optimizing processes to remove bottlenecks, providing real-time tracking for better shipment management, and achieving seamless integration for improved data flow and automation.

yard-manager

Transportation Manager

YOUR CHALLENGE
As a transportation manager aiming to streamline complex logistics operations, you recognize the critical need for adaptability. You are well-versed in challenges such as efficient dock scheduling to prevent congestion, ensuring clear communication among stakeholders, and enforcing safety protocols to protect goods and personnel.

OUR SOLUTION
Our tailored solutions help optimize dock scheduling with advanced tools, improve communication for smooth coordination, and enhance safety and security with comprehensive measures.

logistic-manager-showing-thumbs-up-standing-on-the-2023-11-27-05-03-31-utc

Yard Controller

YOUR CHALLENGE
As a knowledgeable yard controller, you address key issues impacting efficiency and productivity, such as managing dock flow to avoid delays, adopting paperless operations to reduce errors, and efficiently allocating resources to meet changing demands.

OUR SOLUTION
We support you by enhancing dock flow with advanced tools, digitizing operations to eliminate paperwork and improve accuracy, and optimizing resource allocation for smooth and efficient operations.

business-analysts

IT Project Manager

YOUR CHALLENGE
As an IT project manager in the supply chain domain, you excel in cross-functional coordination, aligning technology with logistics and operations goals. You tackle technical challenges in system integration and software customization for effective dock scheduling and yard management, ensuring timely project delivery.

OUR SOLUTION
Our solution help you implement and manage technology to enhance operations and ensure data security and compliance, protecting your business effectively.
portrait-security-and-man-with-smile-in-control-r-2023-11-27-05-25-31-utc

Security Manager

YOUR CHALLENGE
As a security manager, you are responsible for ensuring the safety and security of operations. Key needs involve accurate risk assessment, proactive incident management, and efficient coordination with other departments to prevent security breaches and respond effectively to incidents.

OUR SOLUTION
Enhance forecasting with advanced tools, provide real-time visibility for effective tracking and monitoring, and improve coordination to streamline shipment processes, boosting overall supply chain efficiency.

MAXIMIZE YOUR ROI

Results that matters

15%

reduction in yard trucks
Eliminate Driver Wait Times and Dwell Fees

30%

increase in dock productivity
Maximize your dock throughput

25%

increase in driver productivity
Remove all manual errors during data entry

99.9%

uptime garanteed
For even greater uptime, our Enterprise level guarantees up to 99.99%!
FREE RESOURCE

Case Study

Discover how a leading UK parcel delivery company revamped its yard operations with C3 to handle rapid growth. Despite significant investments in other areas, they overcame outdated manual processes and legacy systems to achieve efficiency.
The

Our Process

Master Your Yard with Our 4-Step Process

Step-1-Plan

Step 1

Plan

Develop strategic yard rules to align with operational priorities and streamline asset allocation for each facility.

Step-2-Schedule

Step 2

Schedule

Leverage customizable shift templates to efficiently handle vehicle entry, exit, and parking assignments, along with amendments and exceptions.

Step-3-Communicate

Step 3

Communicate

Facilitate seamless communication through a web portal for yard requests, automated notifications, and real-time system updates to ensure smooth operations.

Step-4-Measure

Step 4

Measure

Utilize real-time dashboards, scorecards, and comprehensive reports to monitor yard activities, enforce compliance, and enhance overall efficiency and accountability.

Watch a product tour

See our Dock Scheduling System in Action

TALK TO AN EXPERT

Ask a C3 Expert for a Free Consultation

sales

TESTIMONIALS

What They Are Saying

Capterra

"The ability to have variable neighbourhood parking rules for trailers. This allows the business to utilise the yard more effectively, based on day of week and time of day. For busy operations utilising a small main yard with larger offsite parking areas, a reduction in shunt moves is realised."

Jeff
Logistics Manager, UK

G2

"C3 Yard gives our business the highest level of visibility and control of our assets and products in the yards, as well as increased efficiency in our dock operations."

James
Fleet Manager, USA

GetApp

"The visibility it offered not just to a few users for our entire operation from the gatehouses to the baordroom, to the infeeds and to linehaul/planners (something our previous system did not offer!) it's flexibility in being able to cope with any process changes required or needed by the business."

Robert
Yard Manager, UK

Award-Winning Software

  • food-logistics-rockstar-sc-2024
  • Freighwaves-freightech24
  • Canada-top-small-medium-employer-2024
  • Montreal-top-employers-2024
  • Inbound-Logistics-Top-100-IT-providers-2024
  • c3-solutions-pros-to-knows-2024

Up to

20 Years+ of Expertise

Up to

Global Sites

Up to

Active Users Worldwide

YOU MAY NEED TO KNOW

Frequently Asked Questions

Does C3 Yard provide real-time view of the yard?

C3 Yard emphasizes providing users with real-time updates and comprehensive visibility to enhance efficiency. The Yard View feature of C3 Yard offers an accurate depiction of the yard's current status and allows for the manipulation of trailers, such as moving them via drag-and-drop, which automatically assigns tasks to yard drivers.

As trailers are relocated within the yard, the Yard View dynamically updates to display their new positions along with additional information like whether they are loaded or unloaded. Additionally, users have the flexibility to customize the display, including the color coding for different trailer profiles, statuses (such as loaded or empty), types of loads, and various other characteristics.

 

How does your YMS handle gate management?

C3 Yard automates gate operations by allowing for electronic check-in and check-out of vehicles. It can be integrated with RFID technology or license plate recognition to streamline the process, reducing manual errors and wait times.

Is it easy to implement a Yard Management System?

The ease of implementation can vary, but we strive to make it as seamless as possible. Our YMS is designed with user-friendliness in mind, and our implementation team works closely with clients to ensure a smooth transition, including system integration, data migration, and comprehensive training.

What kind of training do you offer?

We offer comprehensive training programs that include on-site training sessions, online tutorials, and user manuals. Training covers all aspects of the YMS, from basic functionality to advanced features, ensuring that all users are proficient in using the system to its full potential.

What challenges does a Yard Management System address?

Our Yard Management System addresses several challenges including vehicle and trailer tracking inefficiencies, dock scheduling conflicts, excessive vehicle wait times, manual check-in and check-out processes, and communication barriers between yard staff and drivers. It also tackles issues related to space utilization and safety in the yard.

How can I track whether my carriers are punctual for their appointments?

To track carrier punctuality, C3 Reservations offers a Carrier Report Card feature. This tool provides insights into a carrier's timeliness compared to its historical performance and against other carriers. For more tailored data, the system's customizable reporting engine lets you generate specific reports, which can be designed in tools like Excel.

How can an organization develop intelligence for managing yard activities?

C3 Yard incorporates a versatile built-in reporting tool that offers varying levels of access—read-only, edit, or admin.

The report generator within C3 Yard allows for the creation of almost any type of yard report, ranging from basic tabular reports to complex pivot tables.

This flexibility supports a comprehensive analysis of yard operations.

 

Can your YMS help with regulatory compliance?

YMS can help with compliance by providing detailed reports on yard activities and ensuring that operations adhere to transportation and safety regulations. It can also maintain records that are necessary for audits and inspections.

What should companies consider when implementing a YMS?

Companies should consider their specific yard operations needs, the compatibility of YMS with existing systems, the ease of use and scalability of the software, and the quality of customer support from the YMS provider. It's also important to ensure adequate training for all users to maximize the benefits of the system.

Book a Demo

Ready to Make a Difference in Your Yard?

Our C3 experts will analyze your needs and design the perfect plan based on your constraints.
dock-scheduling

About C3 Solutions

C3 Solutions is the leading provider of cloud-based Dock Scheduling and Yard Management systems in the supply chain & logistics industry.

Over the years, C3 has gained the confidence of clients around the world and across many industries including retail, grocery, distribution, manufacturing and parcel post.